This article provides recommendations to managers on forecasting schedules and labor.

Overview

Activity-Based Scheduling gives allows managers the ability to base their Labor % on projected sales for their specific department sales and allows for a per schedule analysis to cut labor expenseexpenses. For example, this would be useful if you were writing a Back-of-House (BOH) schedule and wanted to only see the generated sales projections, which would only reflect the Food departments.

Activity-Based

Scheduling allows the manager more control of having the

Scheduling helps managers have the right people on staff,

to

calculate an accurate server-to-customer ratio,

and to analyse the

and analyze the anticipated sales

,

down to each department. 

Schedule Forecasts

Consider the scenario where a manager wants the Kitchen and Server schedules to be based on different other department sales.

  • The table below lists three departments, the department sales, and an “X“ indicating if that department will be included in a schedule’s projection metrics.

  • The sum of all department sales will equal the total sales for the entire store.

  • Each schedule sales value will be less than or equal to the store-wide sales.

Department

Department Sales

Kitchen Schedule

Server Schedule

Food

$1000

X

X

Liquor

$500


X

Catering

$250

X


Total Sales

$1750

$1250

$1500

  • Instead of using department sales directly, our system calculates averages over

6
  • six weeks, ending with the last date of recorded sales.

  • An average is calculated for each day of the week. For example, an average

will be
  • is calculated for

6
  • six consecutive Mondays

in a row
  • .

  • For each day of the week grouping, we remove outliers that are more than one standard deviation away from our mean.

Labor Departments

The departments are configured using the Labor Setup page in Decision Logic:

Image RemovedImage Added

  • Once these departments are configured in Labor Setup, it’s time to create a schedule.

  • When a new schedule is created, the projections panel at the bottom of the page will

    then

    display the Schedule Sales.

  • These are the sales sum

    of the sales that are

    determined by how the Labor schedule's departments have been set up. 

  • Toggling the “All Schedules” switch will display the store-wide sales instead.

Image Removed

Image Added


If you do not want to manually update the Sales Forecasts,

then

you can select Generate sales, and all projected sales will be used. 

Labor Forecasting:

  • Updating the Targeted Sales on the Sales Forecasting page will affect all schedules.

  • When a Target Sales value is set for a day, a

department
  • ‘department sales

override
  • override’ value is created for each department.

  • This generated amount is proportional to the percent that the department sales make of the store’s total sales.

Department

Department Sales

Department Sales Override

Food

$1000

(1000 / 1750) * 2000 = $1142.86

Liquor

$500

(500 / 1750) * 2000 = $571.43

Catering

$250

(250 / 1750) * 2000 = $285.71

Total Sales

$1750

$2000

When viewing the Projections section at the bottom of Labor Scheduler, the Schedule Sales values will update accordingly:.

Department

Department Sales Override

Kitchen Schedule

Server Schedule

Food

$1142.86

X

X

Liquor

$571.43


X

Catering

$285.71

X


Total Sales

$2000

$1428.57

$1714.29


Table of Contents

Table of Contents
Info

For additional questions or assistance

please submit

, please submit a support ticket by

visiting the 

visiting the Decision Logic

Help

Service Center.